Development Brief Creator

Build the consultant instruction, decide exactly what is issued, attach the relevant project information and export a controlled PDF.

Local save not yet confirmed

Input guidance and saving

Select only the fields and images you intend to issue. Blank selected fields appear as To Be Confirmed. Review project-specific requirements before exporting.

First visits open with illustrative example inputs. Replace these with your own evidence before relying on the outputs.

Inputs are stored in this browser, not in an account. They will not follow you to another device and can be lost when browser data is cleared. Uploaded images use separate local storage.

Review the report preview after changing inputs. Reports with outstanding checks remain drafts.

133items included
14selected items marked TBC
0images included

Document Control

Issue status, authorship and document control.

11/11 included

Project Background & Objectives

Why the project exists and what the consultant must help achieve.

7/7 included

Site & Land Information

Physical, legal and contextual information affecting the design.

11/11 included

Planning & Development Controls

Permitted envelope and compliance parameters.

12/12 included
Development Assistant SuiteDevelopment, valuation and decision tools

Development Brief

New Mixed-Use Development

Masterplanner / Lead Designer

Draft – For ReviewRevision P01
New Mixed-Use DevelopmentDevelopment Brief

Controlled document

Document Control & Contents

This brief defines the selected development, design and delivery requirements issued to the appointed consultant.

Document control

Client / developerProject Developer
Project locationRed Sea, Egypt
Issue statusDraft – For Review
Revision / dateP01 /
Prepared byMina Nady Farhan
Approved byTo Be Confirmed
ConfidentialityConfidential – Consultant Issue

Contents

  1. 01Project Background & Objectivesp. 3
  2. 02Site & Land Informationp. 4–5
  3. 03Planning & Development Controlsp. 6
  4. 04Development Programme & Product Mixp. 7
  5. 05Cost & Commercial Parametersp. 8
  6. 06Programme & Phasingp. 9
  7. 07Design Vision & Product Requirementsp. 10
  8. 08Technical & Sustainability Requirementsp. 11–12
  9. 09Consultant Scope of Servicesp. 13–14
  10. 10Deliverables & Submission Requirementsp. 15
  11. 11Governance, Coordination & Communicationp. 16
  12. 12Success Criteriap. 17
  13. 13Risks, Assumptions & Decisions Requiredp. 18
  14. 14Information Issued to the Consultantp. 19
Issue basisInformation marked “To Be Confirmed” requires closure through the project governance process. The consultant must identify gaps and discrepancies before relying on issued information.
New Mixed-Use DevelopmentDevelopment Brief

Development brief / 01

Project Background & Objectives

Issued requirements

A mixed-use destination planned as a commercially viable, phased development with a coherent identity and strong relationship to its site context.

The project forms part of the wider development pipeline and must support the approved business plan, product strategy and infrastructure programme.

Create a distinctive, market-led development that protects the site's natural advantages and is practical to deliver and operate.

Maximise development value within the approved planning envelope while maintaining product quality, market absorption and capital discipline.

Pre-concept / consultant appointment

Existing feasibility, site survey and planning information will be issued through the document register.

Developer, investment committee, relevant authorities, operator and appointed design consultants.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 02

Site & Land Information — Part 1 of 2

Issued requirements

100000

27.0000, 33.9000

Freehold development land

Refer to the issued cadastral and survey drawings.

The design must respond to existing levels and minimise unnecessary cut and fill.

Primary access is from the existing destination road network. Service and emergency access must be independently resolved.

Protect key views and maximise value from premium frontage while retaining public-realm continuity.

Coordinate interfaces, privacy, levels and access with surrounding plots and existing assets.

Utility availability and connection points are subject to confirmation by the infrastructure consultant.

To be confirmed against title, authority and infrastructure information.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 03

Site & Land Information — Part 2 of 2

Issued requirements

Respect environmental, coastal and natural-feature restrictions stated in issued approvals.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 04

Planning & Development Controls

Issued requirements

TDA / applicable local authority

Mixed-use development

155000

1.55

35

Ground + 2 floors

Apply the approved plot, road and environmental setbacks.

40

In accordance with applicable authority requirements and the approved product mix.

To Be Confirmed

Concept, planning, environmental, utilities, fire and life safety approvals as applicable.

Any departure from the approved envelope requires written client approval before design development.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 05

Development Programme & Product Mix

Issued requirements

Residential villas; residential apartments; hospitality; retail and supporting amenities. Quantities and GFA are subject to the approved feasibility schedule.

All areas and construction costs are to be measured on GFA / BUA unless stated otherwise.

650

120000

25000

10000

78

To Be Confirmed

Upper-upscale destination product targeting primary and second-home purchasers.

Prioritise efficient plans, marketable views, privacy, practical servicing and repeatable structural grids.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 06

Cost & Commercial Parameters

Issued requirements

EGP

24000

420000000

To Be Confirmed

7.5

1.00

To Be Confirmed

Optimise structural spans, façade repetition, basement extent, infrastructure lengths and specification without weakening the agreed product positioning.

Arrival sequence, principal public realm, premium frontage, signature amenities and customer-facing spaces.

Land, finance, taxes and developer overhead unless expressly included in the approved cost plan.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 07

Programme & Phasing

Issued requirements

To Be Confirmed

To Be Confirmed

To Be Confirmed

To Be Confirmed

To Be Confirmed

To Be Confirmed

Design the scheme for logical, independently operable phases aligned with infrastructure, sales absorption and capital deployment.

Survey confirmation, authority feedback, infrastructure capacity, operator input and client design-gate approvals.

Allow ten working days for major stage submissions unless agreed otherwise.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 08

Design Vision & Product Requirements

Issued requirements

Contemporary, climate-responsive architecture rooted in the destination context and material palette.

Reference projects are directional; the consultant must develop an original solution appropriate to the site.

Create a legible hierarchy of arrival, streets, pedestrian routes, landscape spaces and destination amenities.

Optimise premium views without compromising privacy, overlooking controls or coherent public realm.

Use locally appropriate, durable and maintainable materials supported by lifecycle considerations.

Provide inclusive access throughout the development in accordance with applicable codes and good practice.

Integrate wayfinding, addressing and signage into the masterplan and public-realm strategy.

Amenities must support the customer proposition, operating model and phased population.

Coordinate back-of-house, servicing, waste, security, maintenance and operator access from concept stage.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 09

Technical & Sustainability Requirements — Part 1 of 2

Issued requirements

Adopt efficient, repeatable structural systems coordinated with product planning and future flexibility.

Develop coordinated, maintainable systems sized against the approved development programme and phasing.

Resolve road hierarchy, emergency access, servicing, parking, pedestrian priority and micromobility.

Use climate-appropriate planting, efficient irrigation and a landscape hierarchy aligned with the operating budget.

Comply with applicable fire, civil defence and emergency-access requirements.

Provide concealed, accessible collection and service routes appropriate to each asset type.

Coordinate backbone infrastructure, telecom, security and smart-development requirements.

Prioritise passive design, energy and water efficiency, responsible materials and measurable operational performance.

Protect environmental constraints and coordinate any marine or coastal works with the relevant approvals.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 10

Technical & Sustainability Requirements — Part 2 of 2

Issued requirements

Demonstrate safe access, replacement strategy, cleaning, maintenance and whole-life considerations.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 11

Consultant Scope of Services — Part 1 of 2

Issued requirements

Lead the appointed discipline from due diligence through construction support, coordinate all required interfaces and maintain compliance with the approved development brief.

Review information issued, identify gaps, validate assumptions and issue a constraints, opportunities and information-required report.

Options, selected concept, area schedules, compliance matrix, design narrative, preliminary technical strategies, cost-check information and presentation material.

Coordinated plans, sections, elevations, schedules, technical strategies, authority material and updated cost information.

Fully coordinated design information suitable for tender, authority approvals and client technical review.

Respond to tender queries, review technical submissions, support bid evaluation and incorporate agreed clarifications.

Review submittals, respond to RFIs, attend agreed inspections, review samples and protect design intent.

Review as-built information, defects, operating information and completion requirements within the appointed scope.

State all exclusions and services by others in the consultant proposal; silence will not transfer assumed responsibilities.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 12

Consultant Scope of Services — Part 2 of 2

Issued requirements

Use the client's agreed coordinates, naming, exchange formats, model detail and common-data-environment requirements.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 13

Deliverables & Submission Requirements

Issued requirements

Concept report and presentation Area, unit and planning compliance schedules Plans, sections, elevations and key details Design and technical narratives Cost-check information Authority submission package BIM/CAD models and drawing register

Editable source files, native BIM/CAD, PDF reports, schedules in spreadsheet format and presentation files.

Use appropriate recognised scales; plans must remain legible when printed at the stated paper size.

All submissions must be internally checked, coordinated, revision-controlled and accompanied by a response-to-comments register.

Each stage must explain the proposal, compliance, changes, unresolved matters, risks and decisions required.

Maintain a live GFA/BUA, saleable/leasable area, unit/key, parking and land-use schedule throughout the appointment.

Do not develop an option beyond the agreed gateway without written client direction.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 14

Governance, Coordination & Communication

Issued requirements

Mina Nady Farhan – Development Manager

To Be Confirmed

Weekly design coordination and monthly executive progress review.

Progress, deliverables, programme, decisions, risks, change and commercial status.

Brief approval; option selection; concept approval; schematic approval; detailed design freeze; tender approval; IFC approval.

No change to approved area, product, cost, programme or quality assumptions without a documented change request and client approval.

To Be Confirmed

The consultant shall prepare, coordinate and track submission information within its scope and support authority meetings as required.

Maintain an interface register and coordinate all appointed disciplines, operators, authorities and client workstreams relevant to the design.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 15

Success Criteria

Issued requirements

No unapproved departure from GFA, density, height, setback, parking or environmental controls.

Approved product mix, target efficiency, market positioning and development-value objectives are maintained.

Design remains within the approved cost target at every gateway.

Stage submissions and authority activities support the approved launch and construction programme.

A distinctive, coherent and deliverable design appropriate to the target market and destination.

Safe, maintainable, serviceable and commercially practical operation.

Defined energy, water, landscape and material objectives are incorporated and evidenced.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 16

Risks, Assumptions & Decisions Required

Issued requirements

Planning-envelope confirmation Infrastructure capacity and connection timing Market absorption and product mix Cost escalation and foreign exchange Authority and environmental approvals Phasing interfaces and temporary works

Issued information is current; land boundaries and levels remain subject to survey confirmation; commercial information may be updated at design gateways.

Confirm consultant appointment, selected development option, product schedule, cost target, approval route and programme.

Final survey; title information; authority correspondence; utility capacities; operator requirements; brand standards.

Maintain a live risk and opportunities register with owner, mitigation, due date, impact and status.

New Mixed-Use DevelopmentDevelopment Brief

Development brief / 17

Information Issued to the Consultant

Issued requirements

Topographic, cadastral, utility, geotechnical and environmental information as listed in the document register.

Applicable regulations, approved masterplan, authority correspondence and plot controls.

Approved feasibility extracts, product schedule, cost plan and programme as authorised for issue.

Previous options, studies, drawings, models, reports and client comments.

Applicable codes, client technical standards, brand requirements and operator standards.

The consultant must review issued information, identify discrepancies and obtain clarification before relying on it.